Zhenkang Xiangneng Hydropower Development Co., Ltd. / Zhenkang Xiangyuan Hydropower Development Co., Ltd.

2018/6/4 15:38:35

  

  Zhenkang Hydropower project (63.7 MW) is a fully invested holding project of Xiangtou International. Its 1st phase includes 5 step hydropower stations, i.e. Muchang Hydropower Station, Dawo Hydropower Station, Banqiao Hydropower Station, Xiaotang Hydropower Station, and Yingpan Hydropower Station, all of which are located at Nanpian River drainage basin, within the territory of Zhenkang County, Lincang, southwestern frontier of China. Muchang Hydropower Station, Dawo Hydropower Station, and Banqiao Hydropower Station are located at secondary grade tributary Nanpian River, in the right bank of Nujiang River first grade tributary Nanting River, within the territory of Muchang Town and Junsai Town, Zhenkang County. Yingpan Hydropower Station and Xiaotang Hydropower Station are located at Mengsha River, a first grade tributary of Nanpian River. Dawo Hydropower Station was combined to grid and started to generate power on Dec. 11, 2013. Banqiao Hydropower Station was combined to grid and started to generate power on Jan. 21, 2015. Xiaotang Hydropower Station started to generate on Sep. 23rd, 2017. Yingpan Hydropower Station has been put into operation on Feb. 8th, 2018 and Muchang Hydropower Station will be put into production in June, 2018.

  Through the development and construction of Zhenkang project, Xiangtou International has accumulated certain experiences in the aspect of project earlier period development and construction and good governmental resources, trained a batch of development and construction management talents, and built good basis for hydropower construction and management in the aspect of talents storage.

  By making its own advantages and by virtue of its rather strong financing ability, Xiangtou International will establish area concentrated development advantages in Yunnan Province, and improve area influence and comprehensive benefits.